PHRP Flemington Construction Surveying Project

Construction surveying support for one of Victoria’s major public housing renewal developments.

Construction Surveying for PHRP Flemington

Base Surveys delivered end-to-end surveying support across piling, excavation, underground services, and structural works for the Holland Court redevelopment in Flemington. Working alongside CDL, ICON, and FRP, our team provided accurate set-out, survey control, and live construction support across multiple project stages.

Location

Flemington, VIC

Client

CDL / ICON / FRP

Builder

ICON

Completed

2026

Leica PinPoint R1000 total station on a construction site with piling equipment and excavators in the background, Flemington

Construction Surveying for PHRP Flemington

The Holland Court redevelopment forms part of the Victorian Government’s Public Housing Renewal Program (PHRP), delivering 286 new dwellings and public open space under a long-term Ground Lease Model.

Base Surveys was engaged across multiple delivery partners to provide surveying support throughout early works, civil infrastructure, underground services, and structural construction phases. The project required strong coordination between CDL, ICON, and FRP to maintain consistent survey control, accurate set-out, and efficient construction sequencing across a complex, multi-stage site.

Our involvement extended beyond standard field set-out. We actively supported site coordination, verification, problem-solving, and day-to-day delivery across changing site conditions and evolving construction requirements.

Surveying Scope Across the Project

Early Works & Civil Surveying for CDL

Our team completed set-out for retention and foundation piling, including verification against design coordinates before works commenced on site.

We also provided detailed set-out support for bulk excavation and trim excavation works, ensuring excavation stages aligned with approved construction sequencing and site staging requirements.

Working within asbestos-managed excavation zones required careful planning, controlled access coordination, and compliance with environmental and safety procedures throughout surveying operations.

Early works survey support for PHRP Flemington construction project in Melbourne
Structural set-out Melbourne survey support for PHRP Flemington concrete works

Builder Support & Site Coordination for ICON

Base Surveys carried out underground services pickup and service location surveys to assist with construction coordination and reduce the risk of clashes between civil, structural, and service infrastructure.

Structural Set-Out for FRP

We provided high-accuracy structural set-out for in-ground footings and associated structural elements throughout the project.

Structural set-out markings on a prepared ground slab with reinforcement bars and a surveyor working in the background, Flemington construction site

Key Technical Challenges

Live site construction surveying at PHRP Flemington with excavation and civil works

Live Asbestos-Managed Environment

Surveying works were undertaken within controlled asbestos-managed zones, requiring strict adherence to environmental and safety protocols.

Complex Early Works

Piling, excavation, services, and structural interfaces were all integrated within a constrained footprint and active work environment.

Survey control for multi-contractor construction works at PHRP Flemington Melbourne

Multi-Contractor Coordination

The simultaneous involvement of CDL, ICON, and FRP created overlapping scopes and shared dependencies across multiple construction stages.

Tight Structural & Civil Tolerances

Accurate survey control was critical throughout piling, footings, underground services, and structural stages.

Our Approach On Site

Base Surveys established and maintained robust survey control and datum consistency across all contractors involved in the redevelopment.

Our team operated with a responsive, hands-on presence throughout the project, providing immediate support as site conditions evolved and construction priorities shifted.

Clear and buildable set-out information
Consistent survey control across trades
Ongoing verification and tolerance checks
Practical support for construction sequencing
Rapid response to design updates and site changes

Delivery & Execution

Base Surveys provided continuous surveying coverage throughout:

PHRP Flemington construction surveying project with retention piling and excavation survey support
Retention piling
Foundation piling
Bulk excavation
Detailed excavation
Underground services
Services verification
Structural footing set-out
Starter bar set-out

Our role extended beyond traditional surveying support, contributing directly to construction coordination, programme support, and site problem-solving across multiple work fronts.

Project Outcome

Base Surveys helped deliver accurate in-ground and structural set-out works across a technically demanding redevelopment environment.

Our surveying support contributed to:

The project demonstrated the importance of responsive, practical surveying support within large-scale, multi-contractor construction environments.

Project Significance

PHRP Flemington highlights Base Surveys’ capability to successfully support:

The project reinforces Base Surveys’ position as a surveying partner focused not only on accuracy, but also on practical buildability, coordination, and construction outcomes.

Talk to Base Surveys About Your Next Project

Base Surveys works alongside builders, civil contractors, and structural teams to deliver accurate construction surveying support across complex projects throughout Victoria.

If your project involves excavation, piling, underground services, structural set-out, or multi-contractor coordination, our team can provide reliable surveying support from early works through to construction delivery.

Scroll to Top